Copper Mine Majdanpek (now Zijin Bor Copper) – Expert supervision of works on following projects:
- Flotation revitalisation in order to increase the capacity from 3.5 to 6.0 Mt of dry ore per year
- Construction of the pipeline for the floating pump station of the tailings ponds “Valja Fundate”
- Construction of the first phase of the floating pump station of the tailings ponds “Valja Fundate”
- Demolition of the old and construction of the new service of the Majdanpek bus station
- Relocation of the Pek River channel.